|























| |
|
Project 04-48 |
 |
ER-Heli-Port West Palm Beach VAMC West
Palm Beach, FL |
| Owner |
| West Palm Beach VAMC |
| |
Prime Design Consultant
services for design of an elevated heli-stop near the existing Emergency
Room of the medical center.
Services include review of existing construction plans, specifications,
and reports; on-site verification of existing conditions; structural
analysis of existing structural systems; review of regulatory codes;
preparation of design criteria and loads; study of alternate structural
systems and preparation of findings report; preparation of a structural
narrative; preparation of calculations, construction plans,
specifications, and construction cost estimates; preparation of testing
and inspection requirements; bid and construction phase services that
include shop drawing review and construction phase site visits.
Rendered photo (shown above) with helicopter captures how the design
will appear when construction is completed.
Estimated Construction Cost: $500,000.00 |
| To read more about
this project see our published projects page
here. |
|