Home
Corp. Summary
Bridge/Garage
Commercial
Corporate
Ecclesiastical
Educational
Health Care
Hotel Projects
Library
Manufacturing
Pre-Engineered
Residential
Tlit-Up
Tech Updates
Testimonials
Newsletter
Published
Our Services
Employment
Benefits
Contact Us
Directions
Search

Project  06-214
South Street Parking Garage
Harrisburg, PA
Owner
Harrisburg Parking Authority
 
 
Structural design of re-shoring for 12-story, 750 vehicle space postensioned parking garage. Re-shoring allows a Contractor to construct upper level concrete floors while lower level floors are still curing. The use of re-shoring compresses the construction schedule resulting in a significant cost savings for the Owner. The garage alleviates parking congestion on nearby streets as well as provide space for additional business development and retention. Construction of the garage is expected to take about 16 months, and should be open for business by July of 2007.

Services included review of existing construction plans, specifications, and reports; structural analysis of existing structural systems; preparation of design criteria and loads; preparation of calculations, construction plans, specifications and construction phase site visits.

Estimated Construction Cost: $12,000,000.00

 

Send mail to officemanager@qproq.com with questions or comments about this web site.
Copyright © 2007 QproQ Engineering, Inc. All Rights Reserved. Legal Notices Home